Predicting the Remaining Economic Life of Wastewater Pipes
Predicting the Remaining Economic Life of Wastewater Pipes
PHASE I: DEVELOPMENT OF STANDARD DATA STRUCTURE TO SUPPORT WASTEWATER PIPE CONDITION AND PERFORMANCE PREDICTION
Paperback
Couldn't load pickup availability
Join our rewards scheme and earn 510 reward points on this purchase!
Earn 510 points on this!
Sign in or Sign up!- Release Date: 15/12/2011
- Barcode: 9781843393337

Predicting the Remaining Economic Life of Wastewater Pipes
Couldn't load pickup availability
Collapsible content
DESCRIPTION
PHASE I: DEVELOPMENT OF STANDARD DATA STRUCTURE TO SUPPORT WASTEWATER PIPE CONDITION AND PERFORMANCE PREDICTION
Accurate prediction of wastewater pipe structural and functional deterioration plays an essential role in the utility asset management process and capital investment planning. The key to implementing an asset management strategy is a comprehensive understanding and prediction of asset condition and performance.
The primary objective of this research is therefore to develop protocols and methods for predicting the remaining economic life of wastewater pipe assets. The limits of deterioration prediction capabilities are not in mathematical models or statistical analysis methods, but in lack of accurate and consistent data. This report presented the short-term phase-1 which has been completed with results from intensive literature reviews, various interviews with utilities, and pipe associations. In this phase, the research team investigated the life cycle of wastewater pipeline and identified the causes of pipe failure in different phases including design, manufacture, construction, operation and maintenance, and repair/rehabilitation/replacement.
The research team has prepared various modes and mechanisms of pipe failure in wastewater infrastructure system as well as identified environmental and societal consequences of the failure. After reviewing all relevant reports and utility databases, the research team has developed a set of standard pipe parameter list (data structure) and pipe data collection methodology. The data structure has been classified into Gold, Silver, Bronze and Wood standard.
DELIVERY & RETURNS
UK Delivery:
- Free delivery on all orders of £10 or more.
- £1.49 delivery fee on orders below £10.
- UK orders are shipped via Royal Mail 2nd Class.
International Delivery:
- Flat rate delivery charges vary by country.
Dispatch and Delivery Times:
- All orders are shipped from our warehouse in Northampton, UK within 48 hours of receipt during working hours.
- UK mainland orders typically arrive within 3-5 working days via Royal Mail 2nd Class.
- International estimated delivery times:
- Europe & Channel Islands: 7 to 10 working days
- USA: 7 to 15 working days
- Rest of the World: 9 to 21 working days
View our full delivery infomation here.
-
OVER
2 MILLION PRODUCTS
-
60 MILLION CUSTOMERS
ACROSS 190 COUNTRIES
You might also like
Loading recommendations...